AFI assists on Newcastle bridge

02 May 2014

The AFI boom lifts at work on Scotswood Bridge

The AFI boom lifts at work on Scotswood Bridge

UK rental company AFI recently provided boom and scissor lifts to Pyeroy as it carried out maintenance work to the Scotswood Bridge in Newcastle.

Pyeroy used two Genie S-65 boom lifts and two Skyjack SJ6826 scissors lifts to carry out repairs to concrete, steelwork and parapets and paint approximately 14500 square metres of the bridge’s structure. About 4000 litres of paint was used.

AFI undertook a site survey before specifying the boom and scissor lifts for the contract and also provided Pyeroy personnel with machine familiarisation training.

Pyeroy Group technical director Brendan Fitzsimons said, “AFI was very flexible in supplying the powered access equipment exactly when it was needed. The machines they specified were the perfect size for the job and provided our contractors with safe, easy access to the steelwork on the bridge.”

Although the project involved some night closures of the bridge to allow work to be carried out on the main arch, safe access routes for pedestrian and cyclists were maintained at all times.

The Genie S-65 has a working height of 21.8 m and an outreach of 17.1 m, while the Skyjack SJ6826’s working height is 10 m.

STAY CONNECTED


Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Euan Youdale Editor Tel: +44 (0)1892 786 214 E-mail: [email protected]
Lindsey Anderson Editor Tel: +1 312 929 4409 E-mail: [email protected]
Tony Radke Sales Manager Tel: +1 480 478 6302 E-mail: [email protected]
Ollie Hodges Sales Manager Tel: +44 (0)1892 786253 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA