Geda bridges Norwegian fjord

30 January 2014

Geda supplied two PH 2032 650 Single hoists for the construction of the 523-m Dalsfjordbrua bridge o

Geda supplied two PH 2032 650 Single hoists for the construction of the 523-m Dalsfjordbrua bridge on Norway’s west cost

German hoist manufacturer Geda was recently brought in to provide access equipment for the construction of the 523 m Dalsfjordbrua, a bridge that spans the Dalsfjord on Norway’s west cost.

Up until now a ferry operated between Dale and Eikeneset on either side of the fjord, but increasing traffic volumes called for a more permanent crossing. The construction of the suspension bridge, which features two 100 m high pylons, is part of an ongoing infrastructure expansion for the Sunnfjord region of Norway.

German contractor Bilfinger Berger erected the two 100 m pylons for the Dalsfjord Bridge. Utleiecompagniet AS (Uco) was contracted to supply the access equipment, and chose its partner Geda to equip the site with two Geda PH 2032 650 Single devices.

The two hoists had to be installed taking into consideration the incline of the pylons. Specially designed anchorages were fitted to ensure the necessary distance to the pylons.

The maximum lifting height of the PH 2032 650 Single is 400 m with a lifting speed of up to 90 m/min. The 1.55 x 3.20 m platform can lift up to 2000 kg in materials, or 25 people.

STAY CONNECTED


Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
Euan Youdale Editor Tel: +44 (0)1892 786 214 E-mail: [email protected]
Lindsey Anderson Editor Tel: +1 312 929 4409 E-mail: [email protected]
Tony Radke Sales Manager Tel: +1 480 478 6302 E-mail: [email protected]
Ollie Hodges Sales Manager Tel: +44 (0)1892 786253 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA